The flow a project manager runs.

Initiation, plan, execution, control, and close. Each phase leaves a page or a system. That is how you see where the engagement is, and when it ends.

A blank sheet, a pencil, and an empty scale beside the two bricks.
  1. 01

    Initiation

    There is a sponsor, a decision, and a success criterion. If one of the three is missing, the engagement does not start.

    Remains: A one-page charter.

  2. 02

    Plan

    Scope, milestones, risks, and what stays out. It fits on two pages. Anything that changes later is written down.

    Remains: A scope plan.

  3. 03

    Execution

    The work is built by milestone. The pipeline, the agent, or the analysis stays in a repository, and each milestone can be run.

    Remains: A delivery that runs, with the milestone closed.

  4. 04

    Control

    A short report: done, next, and risk. The sponsor decides whether to continue, cut, or stop.

    Remains: A one-page status report.

  5. 05

    Close

    Acceptance and handover. The engagement ends when someone on the client's team operates it and can see a failure.

    Remains: A close note: owner, failure, and acceptance.